Description of the project | Policy | Strategy | Proposed Activity / Sub Activity | Date of Commence | Except Output |
---|---|---|---|---|---|
Preparation of 05 number of conservation proposals for government owned building at Galle fort premises |
Improve the historical architectural value of the old Dutch’s buildings |
Upgrading preserve the old Dutch’s building at the Galle Fort |
preparation of conservaion proposals for Magistrate bungalow, two number of Police residence buildings, RDA Building & Small Tea Holding building |
4/1/2019 | Conserving old Dutch’s buildings for adaptive usages |
Rescue conservation of Police barrack |
Improve the historical architectural value of the old Dutch’s buildings | Upgrading & preserve the old Dutch’s building at the Galle Fort |
As an initial step, conserve the roof of the subjected building | 4/1/2019 | Conserving old Dutch’s building for adaptive usages |
Capacity Building – (Only for Heritage & Tourism Mgt) |
Enhance the employees’capacity | Conducting the capacity building programes |
Conduct the training programes | 4/1/2019 | Increasing the capasity of staff officers |
Renovation of the existing toilet block at near the Police residence building |
Improve the sanitary facilities at the Galle fort premises |
Renovate the exisitng toilet block at the Police residence building | Arranging the initial renovation steps | 4/1/2019 | Providing quality sanitary facilities to the visitors |
Conduct Number of 5 awareness program | Improve the historical knowledge of the Galle fort | Conduct awareness programs by targeting grade 9, 10 & 11 school children |
conduct an awareness program twice in months |
4/1/2019 | Improving the knowledge of the school children related to the old Dutch’s forts |
Construct a walking path at the outside of the Galle fort wall | Improve the infrastructure facilities at the Galle fort | Build up a warking path | Construct a walking path at the outside of the Galle fort wall | 4/1/2019 | Developing the well developed infrastructure fasilities |
Renovation of the existing toilet block at the Baladaksha Mw – KAFA |
Improve the sanitary facilities at the Galle fort premises | Rebuilding an existing Toilet at Baladaksha Mawatha – KAFA | Renovation of the existing toilet block at the Baladaksha Mw – KAFA | 3/21/2019 | Providing quality sanitary facilities to the visitors |
Renovation of the wiring system of street lamps (Start the Street lamps Stage 2) | Improve the infrastructure facilities at the Galle fort | Renovation of the wiring system of street lamps | Renovate the wiring system of existing Street lamps | 3/21/2019 | Developing the well developed infrastructure fasilities |
Creat No. of 70 cartoon paintings to exhibit @ the MB dungeon | Improve the tourist attractions of the Galle Fort |
Convert the Moon Bastion dungeon to Children’s gallery |
Drawings, Printing & Preparation of display racks and fixing |
3/18/2019 | Increasing the children knowledge related to the Galle fort |